Every dated duty of a resident-run block, with the section that imposes it.
42 duties, when each falls due, what it costs to miss, and the law itself.
The health check reads your confirmation statement, accounts and verification dates off the register, and can remind you of them.
Check my companyLast reviewed 14 Oct 2026. Each section links to legislation.gov.uk. One is different: s.21 opens the last version in force, because the replacement passed in 2002 was never brought into force.
The money: demands, accounts and consultation
Back to the top| Duty | The law | When | If it is missed | In Resident Led |
|---|---|---|---|---|
| Landlord’s name and address on every demand | LTA 1987 s.47 (opens in new tab); Beltov Properties v Martin [2012] UKUT 133 (opens in new tab) | Every demand, and it must be the landlord’s own address. The agent’s is not enough | The sum is treated as not due until the name and address are given | Demands |
| An address for service in England and Wales | LTA 1987 s.48 (opens in new tab) | Once, and again on any change | Service charge is not due until it is given | Demands |
| Summary of rights with every demand | LTA 1985 s.21B (opens in new tab); SI 2007/1257 (opens in new tab) | Every demand, in the prescribed words | The leaseholder may withhold payment | Demands |
| Demand costs within 18 months | LTA 1985 s.20B (opens in new tab) | Within 18 months of the cost, or a s.20B(2) notice in that time | Older costs are lost | Calendar |
| Costs must be reasonable | LTA 1985 ss.19, 27A (opens in new tab) | All the time | The tribunal can disallow unreasonable costs | Record |
| Summary of costs on request | LTA 1985 s.21 (opens in new tab) | One month from the request, or six months from the year end if later | Offence, fine up to £2,500 (s.25) | Record |
| Inspection of accounts and receipts | LTA 1985 s.22 (opens in new tab) | Facilities for two months, starting within one month of the request | Offence (s.25) | Record |
| Service-charge money held on trust | LTA 1987 s.42 (opens in new tab) | All the time | The company holds it on trust; misuse is a breach of trust | Ledger |
| Section 20 consultation | LTA 1985 ss.20, 20ZA (opens in new tab); SI 2003/1987 (opens in new tab) | Works costing any flat over £250; agreements over 12 months costing any flat over £100 in an accounting period | Recovery capped at £250 a flat (£100 an accounting period) unless the tribunal dispenses | Section 20 file |
| Summary of rights with administration charges | CLRA 2002 Sch 11 (opens in new tab); SI 2007/1258 (opens in new tab) | Every admin-charge demand | The leaseholder may withhold payment | Demands |
| Insurance information on request | LTA 1985 s.30A and Schedule para 2 (opens in new tab) | A summary within 21 days of the request | Offence (Schedule, para. 6) | Record |
The money: demands, accounts and consultation
11
Landlord’s name and address on every demand
LTA 1987 s.47 (opens in new tab); Beltov Properties v Martin [2012] UKUT 133 (opens in new tab)- When
- Every demand, and it must be the landlord’s own address. The agent’s is not enough
- If missed
- The sum is treated as not due until the name and address are given
- In the product
- Demands
An address for service in England and Wales
LTA 1987 s.48 (opens in new tab)- When
- Once, and again on any change
- If missed
- Service charge is not due until it is given
- In the product
- Demands
Summary of rights with every demand
LTA 1985 s.21B (opens in new tab); SI 2007/1257 (opens in new tab)- When
- Every demand, in the prescribed words
- If missed
- The leaseholder may withhold payment
- In the product
- Demands
Demand costs within 18 months
LTA 1985 s.20B (opens in new tab)- When
- Within 18 months of the cost, or a s.20B(2) notice in that time
- If missed
- Older costs are lost
- In the product
- Calendar
Costs must be reasonable
LTA 1985 ss.19, 27A (opens in new tab)- When
- All the time
- If missed
- The tribunal can disallow unreasonable costs
- In the product
- Record
Summary of costs on request
LTA 1985 s.21 (opens in new tab)- When
- One month from the request, or six months from the year end if later
- If missed
- Offence, fine up to £2,500 (s.25)
- In the product
- Record
Inspection of accounts and receipts
LTA 1985 s.22 (opens in new tab)- When
- Facilities for two months, starting within one month of the request
- If missed
- Offence (s.25)
- In the product
- Record
Service-charge money held on trust
LTA 1987 s.42 (opens in new tab)- When
- All the time
- If missed
- The company holds it on trust; misuse is a breach of trust
- In the product
- Ledger
Section 20 consultation
LTA 1985 ss.20, 20ZA (opens in new tab); SI 2003/1987 (opens in new tab)- When
- Works costing any flat over £250; agreements over 12 months costing any flat over £100 in an accounting period
- If missed
- Recovery capped at £250 a flat (£100 an accounting period) unless the tribunal dispenses
- In the product
- Section 20 file
Summary of rights with administration charges
CLRA 2002 Sch 11 (opens in new tab); SI 2007/1258 (opens in new tab)- When
- Every admin-charge demand
- If missed
- The leaseholder may withhold payment
- In the product
- Demands
Insurance information on request
LTA 1985 s.30A and Schedule para 2 (opens in new tab)- When
- A summary within 21 days of the request
- If missed
- Offence (Schedule, para. 6)
- In the product
- Record
The company: Companies House, data and governance
Back to the top| Duty | The law | When | If it is missed | In Resident Led |
|---|---|---|---|---|
| Every director verifies their identity | CA 2006 s.167G(3)(c) (opens in new tab); CA 2006 s.167M (opens in new tab); SI 2025/1118 reg 4 (opens in new tab) | New directors before they act as one; existing directors with the company’s next confirmation statement, including one due after the transition ends in mid-November 2026. Where the company’s confirmation statement was already overdue on 18 November 2025, an unverified director has been barred from acting since the end of 2 December 2025 | Acting unverified is an offence; the confirmation statement cannot be filed | Health check |
| Confirmation statement | CA 2006 s.853A (opens in new tab) | Within 14 days after each review date | Offence (s.853L); the company can be struck off (s.1000) | Calendar |
| Annual accounts | CA 2006 ss.441–442 (opens in new tab); SI 2008/497 reg 4 (opens in new tab) | Nine months after the year end | Penalties of £150 to £1,500, doubled if late two years running | Calendar |
| Staying on the register | CA 2006 ss.1000, 1012 (opens in new tab); CA 2006 ss.1003, 1009, 1010 (opens in new tab); LTA 1987 s.42 (opens in new tab); Companies House, Striking off or dissolving a limited company (opens in new tab) | Keep filing | If struck off, the freehold passes to the Crown. Service-charge money is held on trust, so it sits outside that. If Companies House proposes to strike the company off, filing what is overdue and answering its letters can stop it; if the company applied to be struck off and still runs the block, its directors must withdraw the application | Health check |
| Register of members and PSC register | CA 2006 ss.113, 116 (opens in new tab); Part 21A (opens in new tab) | Kept current; members inspect free | Offences; membership cannot be shown on a flat sale | Record |
| An AGM, if the articles require one | The articles; CA 2006 Part 13 (opens in new tab) | As the articles say | Breach of the articles | Calendar |
| Directors’ general duties | CA 2006 ss.171–177 (opens in new tab) | All the time | Personal liability to the company | — |
| Data protection fee | SI 2018/480 reg 2 (opens in new tab); DPA 2018 s.158 (opens in new tab) | Every year | Fixed penalty of £400 at tier 1 | Health check |
The company: Companies House, data and governance
8
Every director verifies their identity
CA 2006 s.167G(3)(c) (opens in new tab); CA 2006 s.167M (opens in new tab); SI 2025/1118 reg 4 (opens in new tab)- When
- New directors before they act as one; existing directors with the company’s next confirmation statement, including one due after the transition ends in mid-November 2026. Where the company’s confirmation statement was already overdue on 18 November 2025, an unverified director has been barred from acting since the end of 2 December 2025
- If missed
- Acting unverified is an offence; the confirmation statement cannot be filed
- In the product
- Health check
Confirmation statement
CA 2006 s.853A (opens in new tab)- When
- Within 14 days after each review date
- If missed
- Offence (s.853L); the company can be struck off (s.1000)
- In the product
- Calendar
Annual accounts
CA 2006 ss.441–442 (opens in new tab); SI 2008/497 reg 4 (opens in new tab)- When
- Nine months after the year end
- If missed
- Penalties of £150 to £1,500, doubled if late two years running
- In the product
- Calendar
Staying on the register
CA 2006 ss.1000, 1012 (opens in new tab); CA 2006 ss.1003, 1009, 1010 (opens in new tab); LTA 1987 s.42 (opens in new tab); Companies House, Striking off or dissolving a limited company (opens in new tab)- When
- Keep filing
- If missed
- If struck off, the freehold passes to the Crown. Service-charge money is held on trust, so it sits outside that. If Companies House proposes to strike the company off, filing what is overdue and answering its letters can stop it; if the company applied to be struck off and still runs the block, its directors must withdraw the application
- In the product
- Health check
Register of members and PSC register
CA 2006 ss.113, 116 (opens in new tab); Part 21A (opens in new tab)- When
- Kept current; members inspect free
- If missed
- Offences; membership cannot be shown on a flat sale
- In the product
- Record
An AGM, if the articles require one
The articles; CA 2006 Part 13 (opens in new tab)- When
- As the articles say
- If missed
- Breach of the articles
- In the product
- Calendar
Directors’ general duties
CA 2006 ss.171–177 (opens in new tab)- When
- All the time
- If missed
- Personal liability to the company
- In the product
- —
Data protection fee
SI 2018/480 reg 2 (opens in new tab); DPA 2018 s.158 (opens in new tab)- When
- Every year
- If missed
- Fixed penalty of £400 at tier 1
- In the product
- Health check
The building: fire, safety and plant
Back to the top| Duty | The law | When | If it is missed | In Resident Led |
|---|---|---|---|---|
| Fire risk assessment of the common parts | RRO 2005 art. 9 (opens in new tab) | Before occupation, then reviewed regularly; an annual review is the norm | Unlimited fine or up to two years; directors can be prosecuted (art. 32(8)) | Calendar |
| Fire-safety information and fire doors | SI 2022/547 regs 9–10 (opens in new tab) | All blocks of two or more flats; over 11m, communal doors quarterly and flat doors yearly | Offence under the Fire Safety Order | Calendar |
| Higher-risk buildings (18m or seven storeys) | BSA 2022 Part 4 (opens in new tab); SI 2023/396 reg 20 (opens in new tab) | Registration; key building information within 28 days | Fine or up to two years | — |
| Electrical installation in the common parts | Electricity at Work Regs 1989 reg. 4 (opens in new tab) | No set interval; an EICR every five years is recommended | Prosecution after an incident; insurer conditions | Calendar |
| Asbestos in buildings from before 2000 | CAR 2012 reg. 4 (opens in new tab); HSE guidance (opens in new tab) | Survey, register and plan; HSE says review every 12 months | HSE prosecution | Calendar |
| Lifts | LOLER 1998 reg. 9 (opens in new tab) | Thorough examination at least every six months | HSE prosecution; insurer repudiation | Calendar |
| Legionella in communal water | HSWA 1974 s.3 (opens in new tab); ACOP L8 (opens in new tab) | Risk assessment, reviewed on change; two years is the norm | HSE prosecution | Calendar |
| Communal gas | Gas Safety Regs 1998 reg. 36 (opens in new tab); HSWA 1974 s.3 (opens in new tab) | An annual Gas Safe inspection is universal practice. Reg 36 excludes leases of seven years or more, so this is our reading of the law. | Prosecution | Calendar |
| Common-parts health and safety | HSWA 1974 ss.2–3 (opens in new tab); Occupiers’ Liability Act 1957 (opens in new tab) | Risk assessment; an annual review is the norm | Claims; HSE prosecution | Calendar |
The building: fire, safety and plant
9
Fire risk assessment of the common parts
RRO 2005 art. 9 (opens in new tab)- When
- Before occupation, then reviewed regularly; an annual review is the norm
- If missed
- Unlimited fine or up to two years; directors can be prosecuted (art. 32(8))
- In the product
- Calendar
Fire-safety information and fire doors
SI 2022/547 regs 9–10 (opens in new tab)- When
- All blocks of two or more flats; over 11m, communal doors quarterly and flat doors yearly
- If missed
- Offence under the Fire Safety Order
- In the product
- Calendar
Higher-risk buildings (18m or seven storeys)
BSA 2022 Part 4 (opens in new tab); SI 2023/396 reg 20 (opens in new tab)- When
- Registration; key building information within 28 days
- If missed
- Fine or up to two years
- In the product
- —
Electrical installation in the common parts
Electricity at Work Regs 1989 reg. 4 (opens in new tab)- When
- No set interval; an EICR every five years is recommended
- If missed
- Prosecution after an incident; insurer conditions
- In the product
- Calendar
Asbestos in buildings from before 2000
CAR 2012 reg. 4 (opens in new tab); HSE guidance (opens in new tab)- When
- Survey, register and plan; HSE says review every 12 months
- If missed
- HSE prosecution
- In the product
- Calendar
Lifts
LOLER 1998 reg. 9 (opens in new tab)- When
- Thorough examination at least every six months
- If missed
- HSE prosecution; insurer repudiation
- In the product
- Calendar
Legionella in communal water
HSWA 1974 s.3 (opens in new tab); ACOP L8 (opens in new tab)- When
- Risk assessment, reviewed on change; two years is the norm
- If missed
- HSE prosecution
- In the product
- Calendar
Communal gas
Gas Safety Regs 1998 reg. 36 (opens in new tab); HSWA 1974 s.3 (opens in new tab)- When
- An annual Gas Safe inspection is universal practice. Reg 36 excludes leases of seven years or more, so this is our reading of the law.
- If missed
- Prosecution
- In the product
- Calendar
Common-parts health and safety
HSWA 1974 ss.2–3 (opens in new tab); Occupiers’ Liability Act 1957 (opens in new tab)- When
- Risk assessment; an annual review is the norm
- If missed
- Claims; HSE prosecution
- In the product
- Calendar
The right to manage and the RICS Code
Back to the top| Duty | The law | When | If it is missed | In Resident Led |
|---|---|---|---|---|
| The right-to-manage claim | CLRA 2002 ss.78–90 (opens in new tab) | Invitation, then the claim at least 14 days later; acquisition at least three months after the counter-notice date | The claim is treated as withdrawn | RTM claim pack |
| Information from the outgoing landlord | CLRA 2002 s.93 (opens in new tab) | Within 28 days beginning with the day the company’s notice is given, and nothing before the acquisition date | The tribunal can order them to provide it (s.107) | RTM claim pack |
| Service-charge money paid over to the company | CLRA 2002 s.94 (opens in new tab) | On the acquisition date, or as soon after as is reasonably practicable | The tribunal can fix the amount (s.94(3)) and order payment (s.107) | RTM claim pack |
| The company takes over management | CLRA 2002 ss.96–97 (opens in new tab) | From the acquisition date: services, repairs, maintenance, improvements, insurance and management | The company owes the lease’s obligations to the leaseholders and to the landlord (s.97(1)) | Calendar |
| Leasehold law applies to the company as landlord | CLRA 2002 s.102 and Sch 7 (opens in new tab) | From the acquisition date: the service-charge rules (para 4), the s.42 trust (para 11) and the demand details in LTA 1987 ss.47–48 (para 12) | Each rule’s own consequence, as in the money group above | Demands |
| RICS Service Charge Residential Management Code | LRHUDA 1993 s.87 (opens in new tab); SI 2026/298 (opens in new tab) | Budgets, accounts, trust and reserve accounts, consultation | Admissible in evidence at the tribunal | Calendar |
The right to manage and the RICS Code
6
The right-to-manage claim
CLRA 2002 ss.78–90 (opens in new tab)- When
- Invitation, then the claim at least 14 days later; acquisition at least three months after the counter-notice date
- If missed
- The claim is treated as withdrawn
- In the product
- RTM claim pack
Information from the outgoing landlord
CLRA 2002 s.93 (opens in new tab)- When
- Within 28 days beginning with the day the company’s notice is given, and nothing before the acquisition date
- If missed
- The tribunal can order them to provide it (s.107)
- In the product
- RTM claim pack
Service-charge money paid over to the company
CLRA 2002 s.94 (opens in new tab)- When
- On the acquisition date, or as soon after as is reasonably practicable
- If missed
- The tribunal can fix the amount (s.94(3)) and order payment (s.107)
- In the product
- RTM claim pack
The company takes over management
CLRA 2002 ss.96–97 (opens in new tab)- When
- From the acquisition date: services, repairs, maintenance, improvements, insurance and management
- If missed
- The company owes the lease’s obligations to the leaseholders and to the landlord (s.97(1))
- In the product
- Calendar
Leasehold law applies to the company as landlord
CLRA 2002 s.102 and Sch 7 (opens in new tab)- When
- From the acquisition date: the service-charge rules (para 4), the s.42 trust (para 11) and the demand details in LTA 1987 ss.47–48 (para 12)
- If missed
- Each rule’s own consequence, as in the money group above
- In the product
- Demands
RICS Service Charge Residential Management Code
LRHUDA 1993 s.87 (opens in new tab); SI 2026/298 (opens in new tab)- When
- Budgets, accounts, trust and reserve accounts, consultation
- If missed
- Admissible in evidence at the tribunal
- In the product
- Calendar
Coming: in the 2024 Act, not yet in force
Back to the top| Duty | The law | When | If it is missed | In Resident Led |
|---|---|---|---|---|
| The prescribed demand formNot in force | LAFRA 2024 s.55 (new LTA 1985 s.21C) (opens in new tab) | Twelve months after the regulations are made; late 2027 at the earliest | Late-payment provisions have no effect; damages up to £5,000 (s.25A) | Demands |
| The annual report to leaseholdersNot in force | LAFRA 2024 s.56 (s.21E) (opens in new tab) | Within one month of the year end | Damages up to £5,000 | Record |
| Statement of account and accountant’s reportNot in force | LAFRA 2024 s.56 (s.21D) (opens in new tab) | Within six months of the year end, where four or more flats share costs | Breach of a term implied into the lease | Accountant’s pack |
| Information on request, six years backNot in force | LAFRA 2024 s.57 (ss.21F–21G) (opens in new tab); Government response, 15 Jul 2026 (opens in new tab) | “As soon as possible in 2027” | Damages up to £5,000 | Record |
| Administration-charge scheduleNot in force | LAFRA 2024 s.61 (opens in new tab) | Published 28 days before any new charge | Charge not payable; damages up to £1,000 | Calendar |
| Insurance information to leaseholdersNot in force | LAFRA 2024 s.60 (Sch paras 1A–1C) (opens in new tab) | Within a period set by regulations; 30 days proposed | Damages up to £5,000 | Calendar |
| Insurance costs limited to permitted paymentsNot in force | LAFRA 2024 s.59 (ss.20G–20I) (opens in new tab) | With the other Part 4 rules | Excluded costs cannot be charged; damages of one to three times the amount | — |
| Future-demand notice, replacing the s.20B(2) noticeNot in force | LAFRA 2024 s.54 (opens in new tab) | “As soon as possible in 2027” | Form and effect set by regulations | Calendar |
Dates depend on regulations that have not been laid. The 2027 changes explains each one.
Coming: in the 2024 Act, not yet in force
8
The prescribed demand form
LAFRA 2024 s.55 (new LTA 1985 s.21C) (opens in new tab)- When
- Twelve months after the regulations are made; late 2027 at the earliest
- If missed
- Late-payment provisions have no effect; damages up to £5,000 (s.25A)
- In the product
- Demands
The annual report to leaseholders
LAFRA 2024 s.56 (s.21E) (opens in new tab)- When
- Within one month of the year end
- If missed
- Damages up to £5,000
- In the product
- Record
Statement of account and accountant’s report
LAFRA 2024 s.56 (s.21D) (opens in new tab)- When
- Within six months of the year end, where four or more flats share costs
- If missed
- Breach of a term implied into the lease
- In the product
- Accountant’s pack
Information on request, six years back
LAFRA 2024 s.57 (ss.21F–21G) (opens in new tab); Government response, 15 Jul 2026 (opens in new tab)- When
- “As soon as possible in 2027”
- If missed
- Damages up to £5,000
- In the product
- Record
Administration-charge schedule
LAFRA 2024 s.61 (opens in new tab)- When
- Published 28 days before any new charge
- If missed
- Charge not payable; damages up to £1,000
- In the product
- Calendar
Insurance information to leaseholders
LAFRA 2024 s.60 (Sch paras 1A–1C) (opens in new tab)- When
- Within a period set by regulations; 30 days proposed
- If missed
- Damages up to £5,000
- In the product
- Calendar
Insurance costs limited to permitted payments
LAFRA 2024 s.59 (ss.20G–20I) (opens in new tab)- When
- With the other Part 4 rules
- If missed
- Excluded costs cannot be charged; damages of one to three times the amount
- In the product
- —
Future-demand notice, replacing the s.20B(2) notice
LAFRA 2024 s.54 (opens in new tab)- When
- “As soon as possible in 2027”
- If missed
- Form and effect set by regulations
- In the product
- Calendar
Written by Resident Led from the legislation as published on legislation.gov.uk and from the government’s own guidance. We cite the law; we do not give legal advice.
11 Sep 2026 First published.
15 Sep 2026 Added four rows on taking over management under the right to manage: information from the outgoing landlord, service-charge money paid over to the company, the company taking over management, and leasehold law applying to the company as landlord.
21 Sep 2026 Staying on the register: service-charge money is held on trust, so it does not pass to the Crown with the freehold.
24 Sep 2026 Every director verifies their identity: existing directors verify with the company’s next confirmation statement, and new directors before they act, with CA 2006 s.167G added. Section 20 consultation: the £100 limit for long-term agreements applies to each accounting period.
28 Sep 2026 Every director verifies their identity: where the company’s confirmation statement was already overdue on 18 November 2025, an unverified director has been barred from acting since the end of 2 December 2025. Staying on the register: what stops a strike-off. Confirmation statement: a company that does not file can be struck off. The case cited for the landlord’s name is Beltov Properties v Martin.
14 Oct 2026 Asbestos in buildings from before 2000: the 12-month review is cited to HSE’s guidance.
When the government lays the 2027 regulations, the “Coming” rows move up into the groups above and this list says what changed.
Most demands pass on the money and fail on the wording. The wording is what a leaseholder’s solicitor reads.
From £39 a month for the whole block. Pricing · Questions
From £39 a month for the whole block. Pricing · Questions directors ask